2005-2019 all rights reserved. Copyright notice eicpb No. 16004507-2 Technical support:QIANYE
Xinji Jiqing Environmental Energy Co. Ltd. is located in Xinji Clean Chemical Park, was established on November 18, 2013, the project is the livelihood of environmental protection infrastructure in Xinji City. The project is a livelihood and environmental protection infrastructure in Xinji City, with a construction scale of two 300t/d reciprocating grate incinerators with two 6MW pure condensing turbine-generator sets, and synchronized construction of dust removal, desulfurization, denitrification and other environmental facilities. The project covers a total area of 80 acres, with a total investment of about 320 million yuan, an annual domestic waste treatment capacity of about 230,000 tons, and an annual online power generation capacity of about 80 million degrees. The project started in May 2016, began to formally receive domestic garbage in Xinji City in December 2017, and completed the overall test run of the unit in May 2018 and put it into operation.